About BuiltUp

Pricing is the bottleneck. That is the whole reason BuiltUp exists.

Not the site work. The pricing. A client sends a schedule of works as a spreadsheet, every line has to be read and given a rate, and it gets done at nine at night after a full day on site. BuiltUp takes the documents in, prices them against your own rates, and hands the job back in the format your client sent it.

One active project free, with no expiry. No card.

The evening job

Quotes get done after the day is finished.

Ask a small contractor when they price. The answer is almost never during working hours. The day goes on the job: the deliveries, the labour, the client who wants a word, the sub who has not turned up. Pricing waits until everyone has gone home.

Then a schedule of works lands. Thirty lines, or two hundred, written in the client's own sections with their own item numbers, and every one has to be read, understood and given a rate. Miss the deadline and the work goes elsewhere. Rush it and the margin goes instead.

The tools on offer do not help much with that. One is a spreadsheet: free, familiar, and entirely manual. The other is enterprise software, priced and shaped for a main contractor with an estimating team. Between the two there is a gap, and most of this industry works in it.

How we compare to the spreadsheet
A contracts manager in an orange hi-vis vest leaning over a bench in a site cabin, marking up a drawing set beside a hard hat and a mug, with scaffolding and a wet site visible through the window.

What BuiltUp does

Documents in. Priced on your rates. Back in their format.

That is the whole product, described the way it actually runs. Everything else in it exists to serve those three steps.

Documents in, as they arrived

Drawings and a spec, a client's schedule of works as a spreadsheet, or photographs and a voice note off a walk round. Upload what you were sent, in the state you were sent it. Nothing has to be retyped into our layout first.

Priced against your own book

Your material catalogue, your labour roles, your markup, your prelims. Every priced line opens into the materials and hours behind it, so the total can be taken apart and argued with rather than accepted on trust.

Handed back in their format

What comes back is a copy of the client's own file with the rate and total cells filled in. Their sections, their item numbers, their wording, their column widths. Read the return against the original and judge it on that.

Everything it does, feature by feature

What we believe

Four rules the product is built to.

These are not preferences. They decide what gets built and, more often, what does not. If you are weighing up whether to trust something else with your pricing, these are the four questions worth putting to it.

  1. Your rates, not ours

    A national average is somebody else's cost base, bought on somebody else's terms. BuiltUp prices against the catalogue and the labour roles you set up, and where you have not given it a rate it tells you, rather than quietly reaching for a benchmark.

  2. The figure has to be checkable, line by line

    A total nobody can take apart is a total nobody can defend six months later. Every line carries the materials, the hours and the rate it was built from, and what it was measured off. If you cannot follow it back to a decision you made, it should not be in the quote.

  3. Graded, not plausible

    Anything it measures comes back marked high, medium or low confidence, so you check the handful it was unsure about instead of re-checking the lot. A line it cannot price is left blank with the reason next to it. A wrong rate is worse than a visible gap, because you will spot the gap.

  4. The file you send back is the file they sent you

    Re-keying a client's schedule into your own template creates an evening of typing and, later, an argument about what changed between the two documents. Their layout goes out the way it came in, with the pricing columns filled and everything else untouched.

One job

Priced against a figure that already existed.

A client sent over a 33-item schedule of works. BuiltUp priced it and handed back the same spreadsheet, with their sections, their item numbers and their wording intact, and the rate and total columns filled in. The total came out within about 6% of the figure the client's own estimator had reached by hand.

That is one job. It is not a benchmark and it is not being offered as one. It is the reason we suggest the same test to anybody looking at this: take a job you have already priced, put it through, and read the return against the number you know is right.

If it agrees with you, you have saved the evening. If it does not, you can open the line and see exactly where it went a different way, which is worth knowing either way.

A quantity surveyor at a desk in a site office, reading a printed schedule of rates beside a second copy and a calculator, with an orange hi-vis vest hung over the chair behind him.

Who it is for

Built in the UK, for the way work is priced here.

Schedules of works, day rates, prelims, retention, CIS, and clients who expect their own document back. Those are British habits, and a tool written for a different market gets them slightly wrong in ways that cost you an argument later.

Contractors and builders

Small and mid-sized firms pricing domestic work, extensions, refurbishment and fit-out, usually without an estimating department behind them.

Trades

Electricians, plumbers and heating engineers, decorators, groundworkers and landscapers, pricing off day rates and their own supplier prices.

Quantity surveyors

Checking a build-up rather than producing one, and needing to see what a figure was measured from before signing anything.

Project and contracts managers

Working on the job after the tender, where a variation has to be priced and agreed before anyone lifts a tool.

The company

BuiltUp is made by BuiltUp Technologies Ltd, registered in England & Wales, Company No. 16100518, registered office 86-90 Paul Street, London EC2A 4NE. Support is answered in UK working hours.

Put it against a job you have already priced.

You know what the answer should be, which makes it the only test worth running.

Start free

No card. One active project free, with no expiry.

Or set it up with us, 30 minutes, screen-shared